CHECK-LIST METHOD FOR THE SELECTION AND THE SUCCESS
IN THE INTEGRATION OF A SOLAR COOLING SYSTEM IN BUILDINGS
Organisational Feasibility
Due to the demonstrating and innovating features of the system, the targeted building has to dispose of a skilled internal technical staff. Or if it does not have such a staff, an external one must be close and ready to make interventions. The use of sorption technology to produce cold is at the origin of special operation and maintenance actions and checking. An important danger for a solar cooling project is to be commissioned without a significant and reliable monitoring system. The large investment forecast for the operating system itself could lead to such a phenomenon.
Please select an answer in the list for each question. If you do not know, let the answer empty.
Operations & Maintenance
Technical staff: Skills and awareness of O&M regular actions
Choose answer ...
Skilled and internal staff
Skilled and external staff (subcontracted)
Not skilled staff OR No staff
Technical staff: Skills and awareness of O&M regular actions
The targeted building has to dispose of a skilled technical staff in the following fields: solar technology, sorption technology and water treatment (if a cooling tower is used in the system).
Are the O&M actions can improve the system control?
Choose answer ...
Yes
Don't know
No
Are the O&M actions can improve the system control?
If the O&M actions are executed by a skilled technicial staff, these operations can help to identify and fix problems which can occur when the installation is running.
As a consequence, the system and its control is constantly optimized.
Monitoring
Presence of a financed and long term telemonitoring
Choose answer ...
Long term AND financed
Short term OR not financed
No monitoring
Presence of a financed and long term telemonitoring
The solar cooling and heating system must be monitored for two reasons:
First: control of the system, giving information on the operation of the different hydraulic loops ; this represents the basic way to detect defaults on the system and warn the technical staff.
Second: energy and data measurements to control the level of performances.
We consider "long term" as more than 2 years and "financed" as more than 50% grants
Data processing and analyze
Choose answer ...
Planned
Not planned
Don't know
Data processing and analyze
It is important the data were collected and stored safely. Then, an analyse of these data have to be processed by a capable institution to check the installation performances and to make sure the installation works properly.